| Aconetar Bridge on Alcantara Reservoir |
|
|
|
|
|
|
|
Double Viaduct Overall lenght: 400 m Solid ribbed deck arch bridge Main span: 234 m Steel arch span: 220 m Rise: 42.50 m |
|
| La Plata Highway (Cáceres) |
| Opening Highway: July, 2006 |
|
 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Three-span composite structure steel-concrete. Central Span: Bow string Main span: 90 m Special construction: Launching the entire deck from one margin of the river |
|
| Over Jarama River (MADRID) |
|
 |
|
|
|
|
|
|
|
|
|
|
|
| Calatayud -Ricla Viaducts (High-Speed Railway Madrid - Barcelona) |
|
|
|
|
|
|
|
Viaducts over River River Aranda and Jalón
|
|
 |
|
|
|
|
|
|
|
|
|
|
|
| PETRA TOU ROMIOU VIADUCT (CYPRUS) |
|
|
|
|
|
|
|
| LIMASSOL – PAFOS HIGHWAY |
|
 |
|
|
|
|
|
|
|
|
|
|
|
| Railway Bridge over Llobregat River (High Speed Line Madrid - Barcelona) |
|
|
|
|
|
|
|
| Opening: December, 2007 |
|
 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Four-span composite structure steel-concrete. Special construction deck: Launching from one abutment |
|
| Tenerife Island |
|
 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Vic (Barcelona) (Highway Lleida-Girona) |
|
 |
|
|
|
|
|
|
|
|
|
|
|
| Arenteiro Viaduct (High-Speed Railway, Stretch Orense -Lain) |
|
|
|
|
|
|
|
|
|
|
|
|
| Vegarrozadas Viaduct (Asturias) |
|
|
|
|
|
|
|
| Opening Highway: 2005 |
|
| Cantabrico Highway |
| Asturias - Spain |
|
 |
|
|
|
|
|
|
|
|
|
|
|
| Barbantiño Viaduct (High-Speed Railway, Stretch Orense -Lain) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Puenteduero (Valladolid) |
|
 |
|
|
|
|
|
|
|
|
|
|
|
| Esquinzo Viaduct (Fuerteventura) |
|
|
|
|
|
|
|
| Opening Highway: 2005 |
|
| Canary Islands |
| Fuerteventura |
|
 |
|
|
|
|
|
|
|
|
|
|
|
| Puerto Rico Viaduct (Canary Islands) |
|
|
|
|
|
|
|
| Opening Highway: December, 2003 |
|
| Las Palmas - Mogán Highway |
| Gran Canary Island |
|
 |
|
|
|
|
|
|
|
|
|
|
|
| Bridge over Highway E-9 (Barcelona) |
|
|
|
|
|
|
|
| Opening: 2007 |
|
 |
|
|
|
|
|
|
|
|
|
|
|
| Viaducts in the High-Speed Railway between Madrid and Seville |
|
|
|
|
|
|
|
8 Viaducts (Overall length: 2820 m) Spans: 45 m Maximum pier height: 80 m Deck: Post-tensioned concrete box girder Construction method deck: Incremental launching Construction method piers: slip forms
|
|
| (Adamuz- Villanueva Stretch) |
|
 |
|
|
|
|
|
|
|
|
|
|
|
| Cable-Stayed Pedestrian Bridge |
|
|
|
|
|
|
|
Cable-Stayed composite structure steel-concrete to access intake tower. Spans: 45 – 45 m Height: 74 m Special construction: Launching the entire deck from the abutment. |
|
| Access to intake tower at reservoir river Fardes |
| Granada (Spain) |
|
 |
|
|
|
|
|
|
|
|